Sign In | Join Free | My fazendomedia.com |
|
Brand Name : HORIZON
Model Number : EN1065 Steel Prop
Certification : SGS
Place of Origin : CHINA
MOQ : 1500 pcs
Price : pls ask HORIZON
Payment Terms : L/C, T/T
Supply Ability : 20000 pcs per week
Delivery Time : 15-25 days
Packaging Details : pallets, bundles, bulk
Material : Q235 steel pipe
OEM : Available
finishing : Electric galvanized
Standard : EN1065
Size : Prop 30-300, prop 30-350
Application : for slab formwork support
Load capacity : 30KN at top height
Euro Scaffold Steel Prop 30KN With EN1065 Standard, Adjustable for Table Formwork
HORIZON EN1065 Props are designed for shoring horizontal formwork as well as for the various requirements of shoring that may arise on site, however always respect load capacity limitations and assembly instructions.
The high load capability makes HORIZON props the top choice offering reliability and safety for any construction job.
Excellent quality is guaranteed by using high quality of raw materials, the manufacturing process and final treatment applied to the props. All these result in safe and efficient use on sites.
Specification | Capacity (KN) | Height (mm) | Dia (mm) | Weight (Kg) |
HZP30-300 | 30 | 1650-3000 | 76/63 | 20.9 |
HZP30-350 | 30 | 1970-3500 | 76/63 | 23.0 |
HZP30-400 | 30 | 2210-4000 | 76/63 | 25.0 |
HZP20-300 | 20 | 1650-3000 | 60/48 | 15.7 |
HZP20-350 | 20 | 1970-3500 | 60/48 | 16.6 |
HZP20-450 | 20 | 2460-4500 | 60/48 | 28.2 |
HZP20-500 | 20 | 2710-5000 | 60/48 | 30.5 |
Important Instructions:
• Respect the prop spacing in accordance with the project.
• Prop load capacities and engineer’s design must be observed.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
• After removal, props should not be irregularly piled up.
![]() |
38mm X 600mm Scaffolding Leg Screws , Construction Screw Jacks BS1139 Standard Images |